(a) A scope of study shall include, but not be limited to, the following:
- (1) A description of tasks required under section 5 of the act (32 P. S. § 680.5), consistent with the Stormwater Management Guidelines.
- (2) A schedule for completion of the tasks in the preparation of the detailed watershed stormwater plan or revision.
- (3) A description of the level of effort, including personnel requirements, required to complete the tasks within each time period.
- (4) A cost estimate for each task.
- (5) A narrative of services to be provided by consultants, if any, and a justification for the use of consulting services, including the names of the individuals within the consulting firm providing the services and their qualifications.
- (6) A listing of outside funding sources and the amounts of the funds.
(b) The scope of study shall also:
- (1) Establish plan products that will meet the objectives of the act.
- (2) Provide consistency in planning efforts between counties.
- (3) Eliminate duplication of effort in utilizing outside consulting services.
Cross References
This section cited in 25 Pa. Code § 111.12 (relating to agreements).