(a) The application shall include a description of each existing structure proposed to be used in connection with or to facilitate the anthracite coal surface mining activities, including the following:
- (1) The location.
- (2) The plans of the structure which describe its existing condition.
- (3) A demonstration of evidence, indicating whether the structure meets the performance standards or the design requirements of Subchapter B, C or D (relating to surface anthracite coal mines: minimum environmental protection performance standards; anthracite bank removal and reclamation: minimum environmental protection performance standards; and anthracite refuse disposal: minimum environmental protection performance standards).
(b) The application shall include a compliance plan for each existing structure to be modified or reconstructed for use in connection with or to facilitate the surface mining activities. The compliance plan shall include:
- (1) Design specifications for the modification or reconstruction of the structure to meet the design and performance standards of this chapter.
- (2) A construction schedule which shows dates for beginning and completing interim steps and final reconstruction.
- (3) Provisions for monitoring the structure during and after modification or reconstruction to ensure that the performance standards of Subchapter B, C or D are met.
- (4) A showing that the risk of harm to the environment or to public health or safety is not significant during the period of modification or reconstruction.
Source
The provisions of this § 88.43 adopted December 19, 1980, 10 Pa.B. 4789, effective July 31, 1982, 12 Pa.B. 2382.
Cross References
This section cited in 25 Pa. Code § 86.261 (relating to program services); and 25 Pa. Code § 88.41 (relating to operation plan: requirements).