- (a) Prior to redistribution of topsoil or other material, the regraded land shall be scarified or otherwise treated to eliminate slippage surfaces and to promote root penetration.
(b) Topsoil and other materials shall be redistributed in a manner that:
- (1) Achieves an approximate uniform, stable thickness consistent with the approved postmining land uses, contours and surface water drainage system.
- (2) Prevents excess compaction of the topsoil and other materials.
- (3) Protects the topsoil and other materials from wind and water erosion.
Source
The provisions of this § 77.514 adopted March 16, 1990, effective March 17, 1990, 20 Pa.B. 1643.
Cross References
This section cited in 25 Pa. Code § 77.456 (relating to reclamation information).