Or. Rev. Stat. § 480.595
(4) Except as provided in ORS 480.525 and 480.600, installation permit fees are as follows:
(5) Except as provided in ORS 480.600, maximum operating permit fees per year are as follows:
(a) Power boilers of 15 horsepower
or less $110
(b) Other boilers of 15 horsepower
or less $ 55
(c) Power boilers greater than 15
horsepower to 100 horsepower $110
(d) Other boilers greater than 15
horsepower to 100 horsepower $ 55
(e) Power boilers greater than 100
horsepower to 500 horsepower $110
(f) Other boilers greater than 100
horsepower to 500 horsepower $ 55
(g) Power boilers greater
than 500 horsepower $110
(h) Other boilers greater
than 500 horsepower $ 55
(a) to (h) of this subsection,
all cast iron boilers $ 55
(j) Pressure vessels having
a product volume of
20 cubic feet or less $ 50
(k) Pressure vessels having
a product volume
greater than 20 cubic feet $ 50
[1961 c.485 §19; 1967 c.447 §3; 1969 c.582 §16; 1973 c.830 §6; 1973 c.832 §18a; 1974 c.36 §17; 1981 c.566 §2; 1983 c.676 §16; 1991 c.201 §3; 2001 c.162 §1; 2007 c.487 §9; 2009 c.696 §17]