A limited skirting installer must, at a minimum:
- (1) Install the skirting, underfloor skirting access, underfloor ventilation, and underfloor dryer and range exhaust ducts and terminations through the skirting when required;
- (2) Ensure all work performed is in compliance with the Oregon Manufactured Dwelling Installation Specialty Code;
- (3) Affix a certification tag to each manufactured dwelling or cabana on which skirting has been installed.
- (4) Complete all reporting and application forms required by OAR 918-515-0300, 918-515-0340, and 918-515-0360.
- (5) Notify the division or municipality upon completion of the installation work; and
(6) Correct all nonconforming skirting installations within 30 days of receipt of a correction notice from the division or municipality.
[Publications: Publications referenced are available from the agency.]
Statutory/Other Authority
ORS 183.325 - 410, 446.400, 446.405, 455.130 & 455.610
Statutes/Other Implemented
ORS 446.400 & 446.405
History
BCD 1-2010, f. 3-1-10, cert. ef. 4-1-10
BCD 22-1998, f. 11-9-98, cert. ef. 1-1-99
BCD 1-1997, f. 2-24-97, cert. ef. 4-1-97
BCD 19-1995, f. 12-15-95, cert. ef. 1-1-96