- (1) The requirements and procedures for establishing a formal statewide alternate method approval are in ORS 455.060.
- (2) When any part of the Oregon Elevator Specialty Code adopted by the division for elevators does not have an alternate method approval provision, the division may approve any material, design or method of construction not specifically prescribed in the Oregon Elevator Specialty Code, provided the alternate material, design or method of construction is at least equivalent to that prescribed in the code in suitability, quality, strength, effectiveness, fire resistance, durability, dimensional stability, safety and sanitation.
(3) An alternate method approval under section (2) of this rule or under any code provision shall be:
- (a) Granted only for a site-specific transaction; and
(b) Based on documentation placed in the permit file showing the items considered in the approval.
[Publications: Publications referenced are available from the agency.]
Statutory/Other Authority
ORS 455.060 & 460.085
Statutes/Other Implemented
ORS 455.060
History
BCD 13-1999, f. & cert. ef. 10-1-99, Renumbered from 918-400-0540
BCD 18-1995, f. & cert. ef. 12-15-95, Renumbered from 918-400-0030
DC 25-1982, f. & cert. ef. 12-16-82, Renumbered from 814-030-0010