- (1) The first minor label installation inspection is included in the minor label purchase fee.
- (2) In the event that a second inspection is required on an installation, or on a second or third label, the contractor shall pay for the inspection at the callback or reinspection fee rate provided in ORS 460.165(1)(d).
- (3) When a contractor has three failed inspections in the same lot of labels, the contractor shall return any unused minor labels to the division; upon final determination, the division shall not issue minor labels to the contractor for a period of one year.
Statutory/Other Authority
ORS 460.085
Statutes/Other Implemented
ORS 460.085
History
BCD 17-2008, f. 9-26-08, cert. ef. 10-1-08