Or. Admin. R. 734-020-0500
An existing traffic signal may be removed if MUTCD traffic signal warrants are no longer met or a proposed change in geometry or traffic flow pattern will eliminate the need for the traffic signal. No traffic signal shall be removed from the State Highway System without prior approval of the STRE. A traffic control engineering study is required for approval, which shall include all of the following:
ORS 184.616, 184.619, 366.205 & 810.200
ORS 810.200 & 810.210
HWD 5-2012, f. & cert. ef. 3-26-12
TO 5-1999, f. & cert. ef. 12-17-99