Or. Admin. R. 690-215-0080
The Director may require the landowner to install totalizing flowmeters or dedicated measuring tubes on any water supply well, either as a condition of a water right permit or at a later date as circumstances may warrant. The landowner may be required to install totalizing flowmeters or dedicated measuring tubes on existing permitted wells and on wells which are exempted by ORS 537.545.
ORS 183, 536, 537 & 540
WRD 2-2008, f. 6-18-08, cert. ef. 7-1-08
WRD 7-2001, f. & cert. ef. 11-15-01
WRD 13-1986, f. 10-7-86, ef. 11-1-86