- (1) Well alterations as defined in OAR 690-200-0050(7) shall be performed by a licensed Water Supply Well Constructor, or a landowner with a Landowner’s Well Construction Permit and bond.
(2) Water Supply Well Constructors or a permitted and bonded landowner shall record the following data, if available, on the Water Supply Well Report as required under OAR 690-205-0210 before completing alteration work on a well:
- (a) Pre-alteration static water level and date taken.
- (b) Pre-alteration casing diameter.
- (c) Pre-alteration casing gauge.
- (d) Pre-alteration well depth.
- (e) Pre-alteration seal material.
- (3) Well alteration work shall be completed in accordance with OAR 690-215. The Water Supply Well Constructor shall only be responsible for the alteration work they performed under OAR 690-215.
Statutory/Other Authority
ORS 536.090 & 537.505 - 537.795
History
WRD 3-2008, f. 12-22-08, cert. ef. 1-2-09