Management and Catch Reporting Zones shall include those waters of the Columbia River defined as follows:
- (1) Zone 1 is easterly of a line projected from the knuckle of the south jetty on the Oregon bank to the inshore end of the north jetty on the Washington bank, and westerly of a line projected from a beacon light at Grays Point on the Washington bank to the flashing 4-second red buoy "44" off the easterly tip of Tongue Point on the Oregon bank.
- (2) Zone 2 is easterly of a line projected from a beacon light at Grays Point on the Washington bank to the flashing 4-second red buoy "44" off the easterly tip of Tongue Point on the Oregon bank, and westerly of a line projected from the 4-second flashing green light "81" on the Washington bank to a boundary marker on the easterly end of the Beaver Terminal Pier in Oregon, including all waters of Grays Bay, those waters of Deep River downstream of the Highway 4 Bridge, all waters of Seal Slough, those waters of Grays River downstream of a line projected between fishing boundary markers on both banks at the Leo Reisticka farm, and those waters of Elokomin Slough and Elokomin River downstream of the Highway 4 Bridge.
- (3) Zone 3 is easterly of a line projected from the 4-second flashing green light "81" on the Washington bank to a boundary marker on the easterly end of the Beaver Terminal Pier in Oregon, and westerly of a line projected true west from the east or upstream bank of the Lewis River mouth in Washington.
- (4) Zone 4 is easterly of a line projected true west from the east or upstream bank of the Lewis River in Washington, and westerly of a line projected true north from Rooster Rock on the Oregon bank, and those waters of Camas Slough downstream of the western most powerline crossing at the James River Mill.
- (5) Zone 5 is easterly of a line projected true north from Rooster Rock on the Oregon bank, and westerly of a line projected from a deadline marker on the Oregon bank (approximately four miles downstream from Bonneville Dam Powerhouse 1) in a straight line through the western tip of Pierce Island, to a deadline marker on the Washington bank at Beacon Rock.
- (6) Area 2S is from a downstream boundary of a true north/south line through flashing red 4-second light "50" near the Oregon bank to an upstream boundary of a straight line from a deadline marker on the Oregon bank (approximately four miles downstream from Bonneville Dam Powerhouse 1) through the western tip of Pierce Island, to a deadline marker on the Washington bank at Beacon Rock.
Statutory/Other Authority
ORS 183.325, 496.118 & 506.119
Statutes/Other Implemented
ORS 506.129 & 507.030
History
DFW 142-2008, f. & cert. ef. 11-21-08
DFW 9-2007, f. & cert. ef. 2-14-07
FWC 90-1989, f. & cert. ef. 9-6-89
FWC 54-1989(Temp), f. & cert. ef. 8-7-89
FWC 10-1988, f. & cert. ef. 3-4-88