- (1) Not later than December 1, 2016, if located within the Portland AQMA, and not later than April 1, 2017, if located outside the Portland AQMA, all CAGMs not otherwise subject to a permitting requirement must apply for a permit under OAR 340-216-8020 Table 2, Part B, category #84.
- (2) A CAGM that applies for a permit on or before the required date is not in violation of OAR 340-216-0020(3).
(3) CAGMs constructed after September 1, 2016 must obtain a permit prior to construction.
NOTE: This rule was moved verbatim from OAR 340-244-9020 and renumbered.
Statutory/Other Authority
ORS 468.020, 468A.025 & 468A.040
Statutes/Other Implemented
468A.025 & 468A.040
History
DEQ 197-2018, adopt filed 11/16/2018, effective 11/16/2018