Or. Admin. R. 340-071-0210
(2) An agent may issue an alteration permit if the requirements of either paragraph (a) or (b) of this section are met.
(a) Alterations do not increase the system's design capacity and:
(b) Alterations do not exceed the existing system design capacity by more than 300 gpd or 50 percent, and:
(4) Certificate of Satisfactory Completion required. Upon completing installation of that part of a system for which a permit was issued, the system installer must comply with the requirements for pre-cover inspections in OAR 340-071-0170. The agent must issue or deny the Certificate of Satisfactory Completion for the completed construction under OAR 340-071-0175. The projected daily sewage flow into the system may not be increased until the Certificate is issued.
[ED. NOTE: All tables are found in OAR 340-071-0800.]
ORS 454.625 & 468.020
ORS 454.615, 454.655, 454.665 & 454.675
DEQ 29-2025, amend filed 10/01/2025, effective 01/01/2026
DEQ 42-2017, minor correction filed 12/14/2017, effective 12/14/2017
DEQ 15-2017, amend filed 10/31/2017, effective 11/01/2017
DEQ 11-2004, f. 12-22-04, cert. ef. 3-1-05
DEQ 27-1994, f. 11-15-94, cert. ef. 4-1-95
DEQ 8-1983, f. & ef. 5-25-83
DEQ 10-1981, f. & ef. 3-20-81