- (1) Upon first entering the radiation room of a panoramic irradiator after an irradiation, the irradiator operator must use a survey meter to determine that the source has returned to its fully shielded position. The operator must check the functioning of the survey meter with a radiation check source prior to entry.
(2) Before exiting from and locking the door to the radiation room of a panoramic irradiator prior to a planned irradiation, the irradiator operator must:
- (a) Visually inspect the entire radiation room to verify that no one else is in it; and
- (b) Activate a control in the radiation room that permits the sources to be moved from the shielded position only if the door to the radiation room is locked within a preset time after setting the control.
- (3) During a power failure, the area around the pool of an underwater irradiator may not be entered without using an operable and calibrated radiation survey meter unless the over-the-pool monitor required by OAR 333-121-0140(2) is operating with backup power.
Statutory/Other Authority
ORS 453.605 – 453.807
Statutes/Other Implemented
ORS 453.605 – 453.807
History
PH 12-2006, f. & cert. ef. 6-16-06
PH 5-2005, f. & cert. ef. 4-11-05