Prior to abandonment of the site, the requirements of this rule shall be fulfilled:
- (1) Piles shall be stabilized against wind and water erosion and contoured in a manner which will prevent collection of water.
- (2) In addition to the above requirements, any material which has been removed from the pile by natural forces shall be returned to the pile.
- (3) Ponds shall be drained and covered with materials that prevent blowing of dust. Water drained from the ponds shall be disposed of in a manner approved by the Authority.
- (4) Detailed plans for compliance with sections (1), (2) and (3) of this rule shall be submitted to the Authority for review and approval.
Statutory/Other Authority
ORS 453.605 - 453.745
Statutes/Other Implemented
ORS 453.605 - 453.807
History
HD 1-1991, f. & cert. ef. 1-8-91
HD 4-1985, f. & ef. 3-20-85