For the purposes of OAR 141-089-0820 through 141-089-0835, the following definitions are used in addition to those found in ORS 196.600 to 196.990 and OAR 141-085-0510.
- (1) “Completion of the activity” means the responsible party will not return or has not returned to the activity location to resume the activity within 24 hours.
- (2) “Gravity Dredge” means a device with a suction nozzle and hose for conveyance of streambed material for which suction is created by gravity. A gravity dredge does not have an auxiliary power source.
- (3) “Motorized Equipment” means equipment or devices powered by internal combustion, hydraulics, pneumatics, electricity, or mechanical means.
- (4) “In-stream” means below the ordinary high water line of a stream and within the wet perimeter and any adjacent non-vegetated dry gravel bar.
- (5) “Placer Mining” means to search or explore for samples of gold, silver or other precious metals by removing, filling or moving material from or within the bed of a stream.
- (6) “Siphon Dredge” means a device with a suction nozzle and hose for conveyance of streambed material for which suction is created by siphon action. A siphon dredge does not have an auxiliary power source.
Statutory/Other Authority
ORS 196.600-196.692 & 196.795-196.990
Statutes/Other Implemented
ORS 196.600-196.692, 196.795-196.990 & SB 3
History
DSL 77-2018, adopt filed 05/07/2018, effective 05/07/2018