Okla. Stat. tit. 69, § 605
Bridge Contracts - Preliminary Action
Effective Apr 24, 1979Laws 1968, HB 501, c. 415, § 605, emerg. eff. July 1, 1968; Amended by Laws 1979, SB 58, c. 92, § 1, emerg. eff. April 24, 1979.
Whenever the board of county commissioners shall determine to construct a permanent bridge or culvert, the engineer's estimated cost of which exceeds the sum of Ten Thousand Dollars ($10,000.00), it shall adopt a resolution of necessity, containing substantially the following matters, to wit:
- (a) The location of such bridge or culvert, which location shall be so plainly pointed out that the same can easily be determined.
- (b) The material of which such bridge or culvert is to be constructed.
- (c) The approximate width of the roadway and depth of fill, if any, over the crown or floor of the bridge or culvert.
- (d) The approximate length of span or arch of the bridge or culvert.
- (e) The approximate area of the watershed to be drained through the bridge or culvert.
- (f) The estimated cost of the bridge or culvert.
Laws 1968, HB 501, c. 415, § 605, emerg. eff. July 1, 1968; Amended by Laws 1979, SB 58, c. 92, § 1, emerg. eff. April 24, 1979.