- (a) The permittee may petition to change the groundwater basin or subbasin indicated on the permit from which the authorized well(s) will withdraw groundwater. Such requests must be for all well(s) authorized by the permit.
- (b) The petition shall be filed prior to drilling the proposed well(s) or deepening the existing well(s).
- (c) Notice of the petition as specified in 785:30-3-4 must be given.
Added at 11 Ok Reg 2935, eff 6-13-94