- (a) The maximum acreage which can be mined under a limited use permit shall be restricted to two (2) acres.
- (b) The term of a limited use permit shall not exceed twelve (12) months from the date of issuance.
- (c) A limited use permit shall not carry a right of successive renewal.
- (d) A limited use permit site must be reclaimed as required by 45 O.S. Section 725 and the permit within six months following the expiration of the permit term.
- (e) The use of processing equipment shall not be approved for a limited use permit.
- (f) The use of explosives shall not be approved for a limited use permit.
- (g) No more than one limited use permit shall be issued within a 160 acre unit, measuring the unit with the existing limited use permit in the center.
- (h) No limited use permit shall be issued to conduct non-coal surface mining and reclamation operations on high-quality waters or outstanding resource waters, as described in OAC 460:10-13-2.
Added at 26 Ok Reg 3002, eff 8-27-09