- (a) All reports of analyses shall be signed by the technician performing the analysis.
(b) All technicians performing on-site air monitoring shall have:
- (1) The NIOSH course No. 582 on "Sampling and Analysis of Airborne Asbestos Dust", or equivalent. Such course shall have been provided by a government agency or educational institution except, any person with training recognized by DOL prior to the effective date of these rules shall continue to be recognized.
- (2) A valid asbestos worker, asbestos supervisor, asbestos inspector, asbestos management planner, or asbestos project designer license.
- (c) All technicians performing PCM analysis shall have The NIOSH course No. 582 on "ASampling and Analysis of Airborne Asbestos Dust", or equivalent. Such course shall have been provided by a government agency or educational institution except, any person with training recognized by DOL prior to the effective date of these rules shall continue to be recognized.
- (d) All technicians performing bulk analyses must have a four-day course, or equivalent, in the bulk analysis of asbestos-containing materials.
- (e) All technicians performing on-site air monitoring must follow the sampling procedures identified in 380:50-11-1, 380:50-11-2, and where applicable, the approved project design.
(f) All technicians performing on-site air monitoring shall maintain an on-site daily activity log. The log shall include:
- (1) Time of on-site arrival and departure.
- (2) Times of entrance into the regulated area to ensure sample integrity.
- (3) Signature of on-site asbestos supervisor.
- (4) All cassettes must be properly labeled as they are placed for sample collection.
- (g) At least one technician performing on-site air monitoring shall be present on the job site at all times while asbestos abatement work is being performed.
Amended at 9 Ok Reg 3309, eff 7-27-92
Amended at 27 Ok Reg 1887, eff 7-1-10
Amended at 34 Ok Reg 1721, eff 9-15-17