(a) Contracts shall be issued for the commercial application of pesticides in the Structural Pest Category. Information on the contracts shall include:
- (1) Specific information from 2 O. S. Sections 3-81(11) and 3-83, and OAC 35:30-17-21.
- (2) Minimum standards for termite work for existing structures and preconstruction applications. Any minimum requirements that will not be met shall be explained in the contract.
- (b) Visible termite damaged material, whether structural or superficial, that will not be replaced or repaired at the time of the original contract shall be in the contract in a clear statement, e.g. "No replacements of damaged material due to termites or other wood destroying organisms are to be made."
- (c) "Replaced" means to remove all visible damaged material and bring the area back to sound condition using new materials. The use of putty, paint, or similar materials shall not constitute replacement.
- (d) "Repaired" means to bring the area back to sound condition.
Amended at 17 Ok Reg 1018, eff 5-11-00
Amended at 21 Ok Reg 751, eff 4-26-04
Amended at 27 Ok Reg 2441, eff 7-25-10