(a) Operation. The operation of recharge wells shall include:
- (1) Injection pressure. Injection pressure at the wellhead shall not exceed a maximum which shall be calculated so as to assure the pressure in the injection zone does not cause movement of fluid out of the injection zone.
- (2) Mechanical integrity. The owner or operator shall maintain the mechanical integrity of all recharge wells operated under this Subchapter.
- (3) Continuous monitoring. The recharge well(s) shall be monitored continuously, to include at a minimum, monitoring of the injectate for flow, injection pressure and any constituents required by DEQ.
- (b) Maintenance. The method and schedule for maintaining recharge wells shall be included. This shall also provide for redevelopment procedures.
Added at 35 Ok Reg 1333, eff 9-15-18