The following shall be included in an application for an operations permit for an ASR project:
- (1) Site description. A description of the ASR site which includes, at a minimum, a legal description of the site, a discussion of all surface facilities, and a description of the area of hydrologic effect.
- (2) Map. A map showing the constructed ASR project for which a permit is being sought.
- (3) Operations. Proposed operating parameters.
- (4) Contingency plan. Contingency plans to address system failures.
- (5) Groundwater monitoring plan. A plan for monitoring groundwater for changes in aquifer pressure and water quality.
- (6) Water delivery pilot test results. Results of the water delivery pilot test conducted as required in Subchapter 7 of this Chapter.
- (7) Operation and maintenance. Operation and maintenance requirements for the ASR system as required in this Subchapter.
- (8) Closure Plan. A closure plan for the ASR system.
- (9) Cost Estimates. Cost estimates for closure of the facility.
- (10) Financial assurance. Financial assurance to cover the cost of closing the facility.
- (11) Horizontal and vertical extent of stored water. A map showing the estimated maximum extent of stored water and discussion of the method and assumption used.
- (12) Additional information. Any additional information DEQ determines to be necessary for the specific ASR project.
Added at 35 Ok Reg 1333, eff 9-15-18