In addition to the requirements of OAC 252:653-7-2, permit applications for the construction of infiltration basins shall include the following:
(1) construction details to include:
- (A) number of infiltration basin(s);
(B) dimensions of the infiltration basin(s), including:
- (i) surface area in acres;
- (ii) depth and horizontal extent of trenches or other excavations to increase recharge;
- (ii) maximum depth of water in basin; and
- (iii) freeboard allowance
- (C) gradients and elevations;
- (D) method of construction;
(E) materials used;
- (i) soil type and permeability;
- (ii) filter fabric; and
- (iii) aggregate material
- (F) erosion control measures;
- (G) flood control features;
- (H) inflow and outflow/overflow points;
- (I) measurement points; and
- (J) monitoring equipment.
(2) operating parameters:
- (A) schedule of hydraulic loading and basin drying cycles;
- (B) estimated flow rate;
- (C) estimated infiltration rate for each basin;
- (D) estimated hydraulic loading rate with consideration given to drying time; and
- (E) distance to maintain between bottom of basin and top of groundwater mound
- (3) closure plan
- (4) any additional information DEQ determines to be necessary for the specific ASR project.
Added at 35 Ok Reg 1333, eff 9-15-18