In addition to the requirements of OAC 252:653-7-2, permit applications for the construction of recharge wells shall include the following:
- (1) construction details to include, at a minimum, depth and diameter of casings and screens (or open hole completion), description of the installation method, construction features and specifications for the materials to be used;
- (2) plugging and abandonment plan;
- (3) proposed injection procedure;
(4) proposed operating data:
- (A) average and maximum daily injection rates and volumes for each well;
- (B) average and maximum injection pressure; and
- (C) description of the injectate parameters to be monitored;
- (5) any additional information DEQ determines to be necessary for the specific ASR project.
Added at 35 Ok Reg 1333, eff 9-15-18