The permit application shall include an excavation contour map showing:
- (1) contours, at two foot intervals, of the bottom of the proposed excavation;
- (2) the anticipated progression of the construction; and
- (3) the locations and final depth of the boreholes.
Added at 20 Ok Reg 1151, eff 6-1-03