- (a) Required map. The permit application shall include a site map, which may be the existing contour map.
(b) Required details. The site map shall show the following, as applicable to the facility:
- (1) the dimensions of the permit boundary as indicated by legal description;
- (2) the receiving processing, storage or disposal areas;
- (3) buffer zones;
- (4) the locations and surface elevations of each borehole, monitor well, test well, monitoring site, test pit, sampling site and permanent benchmarks;
- (5) the surface and top of casing elevations for each monitoring well or gas probe;
- (6) the surface drainage, including location of diversion ditches, dikes, dams, pits, ponds, lagoons, berms, terraces and other relevant information;
- (7) the location of fencing and gates, utility lines, pipelines, and easements;
- (8) the access roads into and on the site;
- (9) employee and equipment shelters; and
- (10) on- and off-site soil borrow areas.
Added at 20 Ok Reg 1151, eff 6-1-03