- (a) Routine periodic tests. The incinerator design must provide sample injection and collection ports to enable the owner/operator or the DEQ to conduct periodic tests.
- (b) Demonstration. Prior to operation, the owner/operator must conduct a demonstration showing complete destruction of a chemical which requires 2000oF for destruction and which is introduced into the unit under normal operating procedures.
Added at 20 Ok Reg 1151, eff 6-1-03