- (a) Plan required. Leachate may be recirculated in accordance with a plan approved by the DEQ.
- (b) Location. Recirculation may only occur over areas with a composite liner and leachate collection system such that all leachate remains on the composite lined cell.
- (c) Testing. At a minimum, the recirculation plan shall contain a routine testing protocol designed to assess the treatment effectiveness of the recirculation program.
- (d) DEQ approval required. Leachate may not be recirculated until the recirculation plan has been approved by the DEQ.
Added at 20 Ok Reg 1151, eff 6-1-03