In preparing the information specified in 165:70-5-4 and following, to the extent required, the following instructions are applicable to Class A or B utilities:
- (1) All schedules shall be mathematically correct and properly cross-referenced.
- (2) All schedules for Class A and B utilities shall be designated as provided in 165:70-5-4 through 165:70-5-37.
- (3) Headings on all schedules shall clearly indicate the utility name, the nature and content of the schedule and the test period covered.
- (4) All schedules shall be typed and/or clearly legible.
Amended at 11 Ok Reg 3753, eff 7-11-94