N.Y. Comp. Codes R. & Regs. tit. 6, § 363-6.7
(2) Secondary composite liner. The secondary composite liner must be constructed using a minimum two-foot-thick soil liner placed below and in direct and uniform contact with the secondary geomembrane liner. The soil component of the secondary composite liner must:
(v) be overlain by and in direct and uniform contact with a geomembrane.
(b) Construction requirements.
The project engineer must ensure that the installation of the soil and/or GCL components of the liner system conforms to the following minimum requirements:
(1) GCL liner components.
(2) Soil liner components.
(iii) The moisture content and compacted density of the soil component of the liner system must be maintained at all times within the range identified in the moisture-density-permeability relation developed in accordance with subparagraph (c)(2)(v) of this section to ensure that the remolded lift hydraulic conductivity is less than or equal to 1x10-7 centimeters per second.
(c) Certification requirements.
(1) For GCLs, the project engineer must certify that:
(2) For soil barrier components, the project engineer must certify the quality control testing of any soil liner materials, document that the specified material meets the approved engineering drawings, engineering report, CQA and CQC plan, and project specifications. The hydraulic conductivity requirement for the soil liner material must be less than or equal to 1x10-7 centimeters per second. Before and during construction of the soil component of the liner system, the results of the following testing at a minimum must be reviewed and accepted by the project engineer prior to placement:
(3) Quality assurance testing of soil components required under this paragraph must be compared to and evaluated against the quality control testing of paragraph (2) of this subdivision where applicable.
(a) Primary and secondary composite liners.