- (a) For surface impoundments, a construction plan for the facility including a construction quality assurance/construction quality control plan.
- (b) For surface impoundments, a hydrogeologic report that is consistent with the applicable provisions of Part 363 of this Title and that identifies or characterizes the depth to groundwater and bedrock, the critical stratigraphic section and the direction of groundwater flow. The report must also discuss the monitorability of the facility, location of any recharge areas for primary or principal aquifers and the location of any unstable areas.
- (c) A description of how the facility will comply with the operating requirements in Part 360 of this Title and section 361-2.7 of this Subpart.
A storage facility for waste destined for land application, that is not an exempt facility or subject to the registration provisions of section 361-2.3 of this Subpart, must obtain a permit and must submit an application that includes the requirements identified in this section and section 360.16 of this Title. The application must include: