N.Y. Comp. Codes R. & Regs. tit. 6, § 203-4.3
(2) The requirements of this section do not apply to centrifugal natural gas compressors that operate fewer than 200 hours over a rolling 12 month period total provided that the owner or operator:
(d) The compressor wet seal shall be measured annually by direct measurement (high volume sampling, bagging, calibrated flow measuring instrument) while the compressor is running at normal operating temperature in order to determine the wet seal emission flow rate using one of the following methods:
(e) A compressor with a wet seal emission flow rate greater than 3 scfm, or a combined flow rate greater than the number of wet seals multiplied by 3 scfm, shall be successfully repaired within 30 days of the initial flow rate measurement.
(a) Applicability.