N.Y. Comp. Codes R. & Regs. tit. 21, § 154.1
(a) The following rates will be charged for the use of Canal Corporation equipment:
| (1) | Tug | $35 per hour |
| (2) | Tender tug | $20 per hour |
| (3) | Buoy boat (with operator and supplies) | $9 per hour |
| (4) | Derrick boat (without propulsion) | $35 per hour |
| (5) | Derrick boat (self–propelled) | $50 per hour |
| (6) | Self–propelled scow | $15 per hour |
| (with personnel or equipment) | ||
| (7) | Steel flat scow (150–ton) | $35 per day or |
| (without personnel or equipment) | fraction thereof | |
| (8) | Steel flat scow (450–ton) | $45 per day or |
| (without personnel or equipment) | fraction thereof | |
| (9) | Dump scow | $50 per day or |
| (without personnel or equipment) | fraction thereof | |
| (10) | Dipper–dredge | $55 per hour |
| (11) | Hydraulic dredge | $60 per hour |
| (12) | Gasoline pump | $8 per hour |
| (with operator and accessories, but gasoline and oil to be furnished by the user) |
(c) Use of equipment and personnel will be limited to salvage work on floats sunk in the canal channel or those in danger of obstructing navigation.
(2) Division director will determine what personnel and equipment will be needed and probable length of service.
(4) On completion of work and return to Canal Corporation location, division director will prepare revised invoice in quadruplicate, and disperse all copies as follows:
(iv) Division director.
(d) Reimbursement for damages to canal structures.
(1) Division director estimates the cost of the work and submits original estimate invoice as follows:
(2) Division director prepares revised invoice when work is completed. If final invoice exceeds the 75 percent, request is made by the division director for the difference; if it is less than 75 percent, refund is made by the Authority's Office of Investments and Asset Management. The division director disperses invoices as follows: