(d) Items of cost (see steam plant instruction § 463.3).
(39) Window shades and ventilators.
OTHER STRUCTURES AND IMPROVEMENTS
(17) Yard surfacing, gravel, concrete or oil.
Note:
The cost of disposing of material excavated in connection with construction shall be considered as a part of the cost of such work, except as follows: (a) When such material is used for filling, the cost of loading, hauling and dumping shall be equitably apportioned between the work in connection with which the removal occurs and the work in connection with which the material is used; (b) when such material is sold, the net amount realized from such sales shall be credited to the work in connection with which the removal occurs. If the amount realized from the sale of excavated materials exceeds the removal costs and the costs in connection with the sale, the excess shall be credited to the land account in which the site is carried.