N.Y. Comp. Codes R. & Regs. tit. 16, § 255.739
(a) Each pressure-limiting station, relief device (except rupture discs), and pressure-regulating station and its equipment must be subjected, at intervals not exceeding 15 months, but at least once each calendar year, to inspections and tests to determine that:
(b) For steel pipelines whose MAOP is determined under section 255.619(c) of this Part, if the MAOP is 60 psi (414 kPa) gauge or more, the control or relief pressure limit is as follows:
| If the MAOP produces a hoop stress that is: | Then the pressure limit is: |
| Greater than 72 percent of SMYS | MAOP plus 4 percent |
| Unknown as a percentage of SMYS | A pressure that will prevent unsafe operation of the pipeline considering its operating and maintenance history and MAOP. |