N.Y. Comp. Codes R. & Regs. tit. 16, § 255.552
(c) At least 60 days prior to increasing the maximum allowable operating pressure of a distribution system above the limits set below, the operator shall submit a letter of intent. In the event of an emergency, verbal permission may be obtained, but the written notification must be filed promptly.