Subpart 56-7 Phase II A: Work Area Preparation
Department of Labor
56-7.1Air sampling requirements.56-7.2Materials and equipment.56-7.3Asbestos abatement contractor daily project log.56-7.4Establishing each regulated abatement work area.56-7.5Personal and waste decontamination system enclosures.56-7.6Personal protective equipment (PPE).56-7.7Electric power.56-7.8Engineering controls.56-7.9Heating, ventilation, and air conditioning (HVAC) systems.56-7.10Regulated abatement work area pre-cleaning.56-7.11Regulated abatement work area enclosure.