N.Y. Comp. Codes R. & Regs. tit. 12, § 56-11.8
(2) Preliminary preparation. Regulated abatement work area preparation shall also comply with sections 56-7.1 through 56-7.11(d) of this Part.
(4) Limitations. Full regulated abatement work area negative pressure enclosure preparation as per section 56-7.11(a), (b) and (e) of this Part is not required if the following removal conditions are followed:
(iii) Insulation removals to allow for cuts of pipe/duct/conduit and cuts for removal of ACM pipe/duct/conduit or sections thereof shall be performed using glovebag procedures within a negative pressurized tent enclosure, per section 56-8.4(a) of this Part.
(c) Removal.
Removal of the wrapped ACM and asbestos material shall proceed as per the requirements of Subpart 56-8 of this Part.
(d) Final cleaning and clearance procedures.
Final clean-up and clearance procedures for abatement shall comply with Subpart 56-9 of this Part, except that only one stage of cleaning (final) is to be performed. Lockdown encapsulant use is not required, except as indicated for glovebag procedures.
(e) Final waste removal from the site.
The requirements of Subpart 56-10 of this Part shall apply, once all asbestos project regulated abatement work areas have been completed.
The following Phase II abatement procedures shall apply for wrap and cut removal of asbestos- containing or ACM covered abandoned pipes/ducts/conduits. All other requirements of this Part shall apply:
(a) Air sampling and analysis.
Air sampling and analysis on an asbestos project conducted under this section shall be conducted in accordance with the requirements of Subpart 56-4 of this Part.
(b) Regulated abatement work area preparation.