N.Y. Comp. Codes R. & Regs. tit. 12, § 56-11.7
(5) Plasticizing. The ceiling, walls and floor need not be plasticized as per section 56-7.11(e) of this Part for manual or chemical removal methods.
(c) Removal.
Removal of ACM and asbestos material shall proceed as per the requirements of Subpart 56-8 of this Part.
(d) Final cleaning and clearance procedures.
Final clean-up and clearance procedures for abatement shall comply with Subpart 56-9 of this Part, except that only one stage of cleaning (final) is to be performed. Lockdown encapsulant use shall be consistent with section 56-9.1(b) of this Part, with the exception that lockdown encapsulant shall only be applied to non-removal surfaces covered with fire-retardant plastic sheeting.
(e) Final waste removal from the site.
The requirements of Subpart 56-10 of this Part shall apply, once all asbestos project regulated abatement work areas have been completed.
The following Phase II abatement procedures shall apply for removal of non-friable asbestos- containing flooring and/or mastic materials including cove base and associated mastic. (Note: Full work area preparation, attached decontamination system enclosures, abatement and multiple cleanings per this Part are required for beadblaster use or other abrasive abatement method.)
(a) Air sampling and analysis.
Air sampling and analysis on an asbestos project conducted under this section shall be conducted in accordance with the requirements of Subpart 56-4 of this Part.
(b) Regulated abatement work area preparation.