N.Y. Comp. Codes R. & Regs. tit. 12, § 23-5.10
(6) Effective means shall be provided to prevent rope supports from slipping off the ends of the outrigger beams.
(b) Installation of multiple-point suspension scaffolds.
(6) The hoisting rope of every multiple-point suspension scaffold shall be maintained properly lubricated.
(c) Scaffold platform.
The platform of every medium duty multiple-point suspension scaffold shall be at least equivalent in strength to two-inch planking, full size. Such planking shall be laid tight and shall be fastened in place or cleated to prevent dislodgment. Light duty multiple- point suspension scaffolds shall be provided with ladder type platforms constructed in accordance with the schedule listed in Table XII of this Subpart and securely fastened to the hangers by U- bolts or other equivalent means.
(d) Safety railings and screening.
(2) The inboard side (side next to the building or other structure) of every multiple-point suspension scaffold shall be provided with a toeboard.
(e) Overhead protection.
Where there is a hazard from falling objects or materials, multiple-point suspension scaffolds shall be provided with overhead protection in compliance with this Part (rule).
(f) Scaffold dismantling.
When a multiple-point suspension scaffold is being dismantled and the scaffold platform is not lowered intact to the ground or other safe surface, each person performing such dismantling shall be provided with and shall use an approved safety belt or harness together with a lifeline in compliance with this Part (rule).
(a) Design.