N.Y. Comp. Codes R. & Regs. tit. 12, § 23-2.6
(a) During the construction of exterior masonry walls of any building or other structure, except chimneys, from a floor or scaffold inside the building or other structure and such floor or scaffold is more than 35 feet above the adjoining ground or equivalent surface, there shall be provided along the exterior face of such wall a catch platform, installed in compliance with this Part (rule) with the following exceptions: