N.Y. Comp. Codes R. & Regs. tit. 12, § 14-9.27
(2) A surface blowoff shall not exceed 2½ inch pipe size, and the internal and external pipes, when used, shall form a continuous passage, but with clearance between their ends and arranged so that the removal of either will not disturb the other. A properly designed steel bushing, similar to or the equivalent of those shown in Figure P-42, or a flanged connection shall be used.
(3) Blowoff piping shall conform to the requirements of ASME, except that galvanized wrought iron or steel, brass or copper pipe shall not be used.
(b)
(6) All integral economizers, water walls, or water screens forming parts of a steam boiler shall be equipped with drain or blowoff valves conforming to the requirements of this subdivision and subdivisions (a) and (b) of section 14-9.29 of this Subpart for boilers.
(a)