N.Y. Comp. Codes R. & Regs. tit. 12, § 14-9.21
Each boiler shall be provided with a one-quarter inch pipe size valved connection for the exclusive purpose of attaching a test gage when the boiler is in service, so that the accuracy of the boiler steam gage can be ascertained.