N.Y. Comp. Codes R. & Regs. tit. 12, § 14-3.20
(5) The boiler shall be pressure tested, as required, for the new service conditions.
(b) Report requirements.
After complying with the requirements of paragraphs (a)(1) through (5) of this section, a Report of Alteration (Figure 14-3 c) shall be prepared and completed in accordance with section 14-3.3(c)(1) through (3) and distributed as indicated in subdivision (c) of this section.
(c) Distribution of report of alteration including rerating.
Legible copies of the complete Report of Alteration, together with attachments, shall be distributed by the organization responsible for the alteration, to the authorized inspection agency responsible for the inservice inspection of the boiler, the owner or user, the department and to the National Board, if the object is so registered.
(a) General requirements.
Rerating of a boiler by increasing the maximum allowable working pressure (MAWP) or temperature or decreasing the minimum temperature such that additional mechanical tests are required, shall be considered an alteration and may be done only after the requirements of paragraphs (1) through (5) of this subdivision have been met.