N.Y. Comp. Codes R. & Regs. tit. 12, § 14-2.1
Preparation for inspection.
Department of Labor
- (a) A boiler shall be prepared for internal inspection or hydrostatic pressure by the owner or user on a date specified by the commissioner or an insurance company. Unless the owner or user agrees to a shorter period, such inspection shall be made not less than 15 days after notice thereof.
(b) The owner or user shall prepare a boiler for internal inspection in the following manner unless the inspector advises to the contrary:
- (1) Water shall be drawn off and the boiler thoroughly washed.
- (2) All manhole and handhole plates and washout plugs and the water column connection shall be removed and the furnace and combustion chambers thoroughly cooled and cleaned.
- (3) All grates of internally fired boilers shall be removed.
- (4) At each annual inspection brick work shall be removed as required by the inspector.
- (5) The steam gage shall be removed for testing where there is evidence that its operation has been inaccurate and faulty.
- (6) All leaks of steam or hot water into the boiler shall be stopped.