N.Y. Comp. Codes R. & Regs. tit. 10, § 128-3.6
(8) Wastewater treatment plants with either surface or subsurface discharges within the watershed shall provide phosphorus removal using the best treatment technology so that the wastewater treatment plant is designed to be operated and maintained to meet the following requirements:
| SPDES Permitted | Total |
|---|---|
| Total Flow | Phosphorus Limit |
| (gallons/day) | (mg/l) |
| ≤50,000 | 1.0 |
| >50,000 and <500,000 | 0.5 |
| ≥500,000 | 0.2 |
(c) Requirements for wastewater treatment plants local coliform restricted basins. No new wastewater treatment plants with surface discharges, or expansions of existing wastewater treatment plants with surface discharges, shall be allowed in a coliform restricted basin. A variance from this provision may be sought in accordance with the requirements set forth in section 128-6.1(d)(1) of this Part.
(2) Within the 60-day travel time to the intake the following requirements are applicable:
(iii) new and existing wastewater treatment plants with subsurface discharges may commence or continue to operate provided that the treated effluent is also subject to sand filtration and phosphorus removal, and for SPDES permitted discharges greater than 30,000 gallons per day (gpd), disinfection, as required by these rules and regulations.
(e) Treatment requirements for wastewater treatment plants located in the watershed and beyond the 60-day travel time to intake.
(2) Beyond the 60-day travel time to the intake the following requirements are applicable:
(iii) new and existing wastewater treatment plants with subsurface discharges may commence or continue to operate, provided that the treated effluent is also subject to sand filtration, phosphorus removal, and for SPDES permitted discharges greater than 30,000 gallons per day (gpd), disinfection, as required by these rules and regulations.
(f) Design, operation and maintenance requirements.
(2) The criteria used by the department to approve the design for any new wastewater treatment plant or the portion of any new or existing wastewater treatment plant which is being expanded or altered or modified shall be all applicable requirements of law, including the standards set forth in the following documents:
(3) The department shall not approve a wastewater treatment plant, or any proposed expansion of a wastewater treatment plant, which discharges within the watershed, if there is inflow or infiltration into a sewerage system connected to such wastewater treatment plant which causes either:
(5) All wastewater treatment plants shall meet the following requirements to insure uninterrupted reliable operation:
(6) The following requirements shall apply to all wastewater treatment plants with subsurface discharges or absorption fields located in the watershed:
(iv) the use of pumping, mechanical dosing or other mechanical devices requires a pump chamber equipped with an alarm to indicate malfunction, a backup pump, and any other safety features required by the department to prevent overflow.
(7)
(8) The transfer of any approval or permit issued by the department for the construction and/or operation of any wastewater treatment plant shall require department approval. The department shall approve such transfer provided that the transferee demonstrates sufficient financial, technical, and professional capability to construct, operate and/or maintain the subject wastewater treatment plant in compliance with applicable laws, as cited in paragraph (a)(1) of this section, the provisions of these rules and regulations, and the terms and conditions of any approval or permit granted by the department.
(g) Application requirements.
(1) An application for review and approval of a new wastewater treatment plant shall include the following information:
(2) An application for review and approval of an expansion or of an alteration or modification of a new or existing wastewater treatment plant shall include all of the information required in paragraph (1) of this subdivision where applicable, and shall either:
(d) Treatment requirements for wastewater treatment plants located within the 60-day travel time to intake.
(a) Minimum requirements.