1. Definitions. As used in this section, the following terms shall have the following meanings:
(c) In the event that the electric corporation determines that it is necessary to install one or more dedicated transformers or other equipment to protect the safety and adequacy of electric service provided to its other customers, a customer-generator shall pay the electric corporation's actual costs of installing the transformer or transformers or other equipment:
4. Rates. An electric corporation shall use net energy metering to measure and charge for the net electricity supplied by the corporation and provided to the corporation by a customer-generator, according to the following requirements:
5. Safety standards. (a) Each electric corporation shall establish and maintain standards necessary for net energy metering and the interconnection of wind electric generating equipment to its system and that the commission shall determine are necessary for safe and adequate service and further the public policy set forth in this section. Such standards may include, but shall not be limited to:
(c) Unless otherwise determined to be necessary by the commission, an electric corporation may not require a customer-generator to comply with additional safety or performance standards, or perform or pay for additional tests, or purchase additional liability insurance, provided that: