N.Y. Environmental Conservation Law § 19-0306
2. Within thirty days of the effective date of this section and pursuant to the state administrative procedure act, the commissioner shall, in consultation with the commissioner of health, propose final draft operating requirements for emissions of air contaminants from municipal solid waste incineration facilities. Such operating requirements shall be effective and shall apply to municipal solid waste incineration facilities for which a permit to construct has been issued and final engineering drawings have been accepted by the commissioner after one hundred twenty days after such operating requirements have been formally promulgated. Such operating requirements shall govern the operation and management of such facilities with respect to air contamination, and shall include but not be limited to provisions for: a. Maintenance of a minimum incineration temperature and the means and location at which such temperature shall be measured; b. Residence or exposure time for incineration; c. Appropriate levels of control for acid gas, sulfur dioxide, oxides of nitrogen, and hydrochloric acid with regard to the following: