- 1. If the State Engineer designates a basin as a critical management area pursuant to subsection 7 of NRS 534.110, the State Engineer shall, in the order designating the critical management area, affirm or modify the perennial yield of the designated basin.
- 2. The State Engineer may, by order, modify the perennial yield of a basin set forth in the order designating the critical management area pursuant to subsection 1 if the State Engineer determines, after consideration of the best available science, that the perennial yield of the basin is different from the perennial yield set forth in such order.
- 3. The State Engineer shall, before reviewing the results of a groundwater management plan pursuant to subsection 8 of NRS 534.037, review the perennial yield of the basin set forth in the order pursuant to subsection 1 and may modify the perennial yield of the basin pursuant to subsection 2 if the State Engineer determines the perennial yield has changed.
(Added to NRS by 2023, 842)